المباني التجارية
START WITH THE SPACE
Understand the Application
Offices, hotels, retail areas and public buildings have different occupancy patterns and installation requirements. Coordinate air handling and room terminals around those needs.
Key Selection Inputs
- Space use and occupancy
- Ventilation and room thermal duty
- Operating hours and zoning
- Ceiling or plant-room constraints
EQUIPMENT APPROACH
Discuss a Suitable Configuration
FROM REQUIREMENT TO CONFIGURATION
عملية حل المشروع لدينا
01
متطلبات
Understand the application and operating conditions.
02
اختيار
Discuss equipment families and the operating point.
03
التكوين
Coordinate functional sections, controls and interfaces.
04
دعم التثبيت
Confirm drawings, access and site connections.
05
بعد البيع
Discuss operation, maintenance and service needs.
Prepare the Technical Brief
| Selection information | What to share |
|---|---|
| Space use and occupancy | Share the available design requirement with the selection team. |
| Ventilation and room thermal duty | Share the available design requirement with the selection team. |
| Operating hours and zoning | Share the available design requirement with the selection team. |
| Ceiling or plant-room constraints | Share the available design requirement with the selection team. |
استفسار المشروع
Discuss Your Commercial Buildings Project
Share your project requirements. Our team will discuss the equipment and configuration with you.
من الهواء النظيف
إلى مستقبل أفضل.