مساحات عالية الخليج
START WITH THE SPACE
Understand the Application
Building height, geometry and working zones guide the air-distribution arrangement. Equipment selection considers heat exchange, installation position and the occupied area.
Key Selection Inputs
- Building height and floor layout
- Occupied-zone conditions
- Heat source and cooling medium
- Roof structure and obstructions
EQUIPMENT APPROACH
Discuss a Suitable Configuration
FROM REQUIREMENT TO CONFIGURATION
عملية حل المشروع لدينا
01
متطلبات
Understand the application and operating conditions.
02
اختيار
Discuss equipment families and the operating point.
03
التكوين
Coordinate functional sections, controls and interfaces.
04
دعم التثبيت
Confirm drawings, access and site connections.
05
بعد البيع
Discuss operation, maintenance and service needs.
Prepare the Technical Brief
| Selection information | What to share |
|---|---|
| Building height and floor layout | Share the available design requirement with the selection team. |
| Occupied-zone conditions | Share the available design requirement with the selection team. |
| Heat source and cooling medium | Share the available design requirement with the selection team. |
| Roof structure and obstructions | Share the available design requirement with the selection team. |
استفسار المشروع
Discuss Your High-Bay Spaces Project
Share your project requirements. Our team will discuss the equipment and configuration with you.
من الهواء النظيف
إلى مستقبل أفضل.